Projects

Quincy – Storm Riley Emergency Response #18-211

Emergency infrastructure repair contract in response to the City of Quincy’s declared State of Emergency due to coastal damage from March 2018’s Nor’easter Storm Riley. Focus of work was sidewalk and road repairs impacted by erosion damage and intent was to restore affected areas to pre-storm conditions. Project scope included road and sidewalk reconstruction around…

Read More

Roxbury Walkable Streets

Sidewalk and pedestrian ramp reconstruction in the following Roxbury locations identified as high priority by the City of Boston: Elm Hill Ave, Wyoming, Harrishof Street, Humboldt Ave, Homestead Street, Walnut Ave and Crawford Street. Scheduled completion June 2019. Project Scope Highlights: ADA compliant sidewalks and pedestrian ramps with saw cut joints: (105,000)SF Reset and installed…

Read More

Boston CIP 17-24

Reconstruction of Summer Street in The Seaport Area of South Boston. Scheduled completed August of 2019. Installed new street lighting conduit, pull boxes, ornamental poles/LED luminaires, controllers and electrical service connections. Installed new traffic control conduit, pull boxes, mast arms with foundations, signals with foundations, controllers and electrical service connections. Installed new RRFB systems. Reset…

Read More

Newton 15-112 – Roadway & Signal Improvements at Beacon Street & Collins Road

The work included cold plane and overlay of the existing roadway with bituminous concrete, full depth pavement reconstruction, installation of new granite curb, new cement concrete sidewalk, installation of new traffic signals, installation of a new pedestrian activated (HAWK) signal, various storm water utility upgrades, new ornamental LED street lighting and landscaping. Project Scope Highlights:…

Read More

Milton & DCR T16-1 – Blue Hill Parkway Traffic Improvements & Road Reconstruction

The purpose of this project was to make traffic, roadway, sidewalk, street lighting and streetscape/landscaping improvements along Blue Hills Parkway from Eliot Street to Mattapan Square with signal system related modifications at three intersections north of Mattapan Square and one south of Eliot Street. The scope included full traffic signal upgrade, new traffic controllers at…

Read More

Department of Conservation and Recreation: East of Route 495

Fred DeRoma & Son, Inc. completed work under this contract that consisted of, but was not limited to, the installation of new pedestrian ramps, rehabilitation of existing pedestrian ramps, installation of new granite curb, removal and resetting of existing granite curb, rehabilitation of concrete and bituminous sidewalks, and the installation of new concrete and bituminous…

Read More

Boston Convention Center

BOSTON CONVENTION & EXHIBITION CENTER North Ramp Wall Weatherproofing Improvements Fred DeRoma & Son, Inc. provided work on this project that consisted of the excavation of a 4,000 square foot concrete walkway and delaminated/loose existing waterproofing membrane or drainage board. Then we installed a new 4,000 square foot concrete walkway, which included the use of…

Read More

Boston CIP 17-31

Boston CIP 17-31: Reading Street. Reading/Kemble Street (820)LF to the following: “Highway Reconstruction in Bennett Street, Corey Street, Farnham Street, Grantley Street, Hillock Street, Kemble Street, Lovis Street, Proctor Street, Railroad Street, Reading Street, and Sanford Street. Work included (10”) pavement reclamation, pavement milling & overlay, reset existing and install new curbing, construct new concrete…

Read More

Boston CIP 16-22 Mattapan Square Streetscapes

BOSTON CIP 16-22 Mattapan Square Streetscape Improvements on Blue Hill Avenue Fred DeRoma & Son, Inc. installed a new drip irrigation system, including water main tap, meter pit, backflow preventer, electrical service, and irrigation controls. Construct raised planting beds using granite edgestone for landscaping along the median and in the traffic islands, backfilling with planting…

Read More

Boston Area 2 and Area 3 ADA Reconstruction

Boston Area 2 and 3 ADA Sidewalk and Pedestrian Ramp Reconstruction (Contracts 43698 & 43699) The work provided by Fred DeRoma & Son, Inc. under this contract consisted of, but was not limited to, making repairs to existing brick, cement concrete and bituminous sidewalks and driveways, resetting existing edgestone, new granite edgestone, and the construction…

Read More