MassDOT 106432: Sidewalk, Wheelchair Ramp, and Crosswalk Repairs and Improvements at Various CA/T Locations

MassDOT 106432

Description: Completed sidewalk reconstruction for MassDOT in coordination with the Boston Public Works and Boston Transportation Department.  The work included in various ADA upgrades and full depth roadway reconstruction at key pedestrian crossing points within Boston Proper. Project Highlights: 59,085 square feet of concrete Sidewalks, Ramps, and Driveways 1,128 linear feet of New Granite Curb…

Read More

Westwood Pedestrian Safety Enhancements Project

Westwood Pedestrian Safety Enhancements Project

Pedestrian safety enhancements in the Town of Westwood through the installation of new ADA compliant pedestrian ramps, new and reset granite curb, new pedestrian signal devices and thermoplastic pavement markings. Project Highlights: 1,200 linear feet of New Granite Curb 2,000 linear feet of Granite Curb Removed and Reset 2 Solar Powered RRFBs 2 Solar LED…

Read More

Quincy FY20 – Roadway Improvements Project

Quincy FY20 - Roadway Improvements Project

Roadway and sidewalk reconstruction to (18) streets located in Quincy, Massachusetts.  These improvements consisted of new ADA complaint concrete sidewalks, driveways, wheelchair ramps, new and reset granite curb, full depth reclamation and new asphalt road assemblies Project Highlights: 6,730 linear feet of New Granite Curb set 19,242 linear feet of Granite Curb Removed and Reset…

Read More

Milton Academy – Centre Street Pedestrian Improvements

Milton Academy - Centre Street Pedestrian

Completed intersection improvements at the intersection of Voses Lane and Centre St to improve pedestrian safety. These improvements consisted of the installation of new rectangular rapid flashing beacons (RRFBs), new granite edge stone, ADA compliant concrete walkways and pedestrian ramps, the construction of a stone masonry retaining wall, new thermoplastic pavement markings, and street signage.…

Read More

MassDOT 106136 – Gallivan Blvd and Morton Street Road Improvement including Traffic Signals

MassDOT 106136 - Gallivan Blvd and Morton Street Road Improvement including Traffic Signals

Completed highway reconstruction and intersection improvements on Gallivan Boulevard and Morton St located in Boston, Massachusetts. Installed new Traffic Signal Reconstructions at (5) intersection, including new mast arms and drilled shaft foundations, controllers, pedestrian signals, audible push APS push buttons and video detection. Installed new street lighting infrastructure, poles, LED luminaires and photo-electric control. Installed…

Read More

Brookline PW21-06 Columbia Street Reconstruction

Brookline PW21-06 Columbia Street Reconstruction

Roadway reconstruction and pedestrian improvements on Columbia St and Hamilton Rd in Brookline, Massachusetts. The existing road was stabilized by pulverizing and regrading before the installation of new asphalt binder and top courses.  The scope also included new traffic calming bump outs, new concrete sidewalks, pedestrian ramps, drainage structures and inlay pavement markings. Project Highlights:…

Read More

Boston #51527 – Sidewalk Repairs on Various Streets Including Pedestrian Ramp Upgrades in the City of Boston

Boston sidewawlks

Various ADA improvements to walkways and ramps in the Boston Area.  Improvements ranged from resetting granite edge stones, ADA compliant pedestrian ramps and walkways, bituminous concrete surfaces and brick sidewalks. Project Highlights: 30,000 square feet of concrete sidewalks, wheel chair ramps and driveways 2,500 linear feet of Granite Curb Removed and Reset to date Qualified…

Read More

Quincy – Storm Riley Emergency Response #18-211

Emergency infrastructure repair contract in response to the City of Quincy’s declared State of Emergency due to coastal damage from March 2018’s Nor’easter Storm Riley. Focus of work was sidewalk and road repairs impacted by erosion damage and intent was to restore affected areas to pre-storm conditions. Project scope included road and sidewalk reconstruction around…

Read More

Roxbury Walkable Streets

Sidewalk and pedestrian ramp reconstruction in the following Roxbury locations identified as high priority by the City of Boston: Elm Hill Ave, Wyoming, Harrishof Street, Humboldt Ave, Homestead Street, Walnut Ave and Crawford Street. Scheduled completion June 2019. Project Scope Highlights: ADA compliant sidewalks and pedestrian ramps with saw cut joints: (105,000)SF Reset and installed…

Read More

Boston CIP 17-24

Reconstruction of Summer Street in The Seaport Area of South Boston. Scheduled completed August of 2019. Installed new street lighting conduit, pull boxes, ornamental poles/LED luminaires, controllers and electrical service connections. Installed new traffic control conduit, pull boxes, mast arms with foundations, signals with foundations, controllers and electrical service connections. Installed new RRFB systems. Reset…

Read More