Completed sidewalk reconstruction for MassDOT in coordination with the Boston Public Works and Boston Transportation Department. The work included in various ADA upgrades and full depth roadway reconstruction at key pedestrian crossing points within Boston Proper.
Project Highlights:
- 59,085 square feet of concrete Sidewalks, Ramps, and Driveways
- 1,128 linear feet of New Granite Curb
- 1,434 linear feet of Granite Curb Removed and Reset
- 586 tons of Hot Mix Asphalt flatwork
- 1,737 cubic yards of excavation