Westwood Pedestrian Safety Enhancements Project

~ We make Greater Boston Accessible ~

Pedestrian safety enhancements in the Town of Westwood through the installation of new ADA compliant pedestrian ramps, new and reset granite curb, new pedestrian signal devices and thermoplastic pavement markings.

Project Highlights:

  1. 1,200 linear feet of New Granite Curb
  2. 2,000 linear feet of Granite Curb Removed and Reset
  3. 2 Solar Powered RRFBs
  4. 2 Solar LED Flashing Signs
  5. 31,000 square feet of Concrete Sidewalks, Ramps, Driveways placed
  6. 500 square feet of New Signage installed