MBTA – A08CN01 – Bus Stop Improvements

~ We make Greater Boston Accessible ~

Scope of Work Description:

Reconstruction of (76) bus stops throughout MA and the installation of (1,274) system-wide bus stop signs.  Reconstructed over (52,085)SF of ADA compliant concrete flatwork, (6,255)LF of granite curbing, (8) LED flashing traffic signs, (6) RRFB Pedestrian Warning Systems, (400)LF of electrical conduit, and (2) new Eversource Service connections