~ We make Greater Boston Accessible ~

Projects

MassDOT 106432

MassDOT 106432: Sidewalk, Wheelchair Ramp, and Crosswalk Repairs and Improvements at Various CA/T Locations

Description: Completed sidewalk reconstruction for MassDOT in coordination with the Boston Public Works and Boston Transportation Department.  The work included in various ADA upgrades and full depth roadway reconstruction at key pedestrian crossing points within Boston Proper. Project Highlights: 59,085…

Read More
Westwood Pedestrian Safety Enhancements Project

Westwood Pedestrian Safety Enhancements Project

Pedestrian safety enhancements in the Town of Westwood through the installation of new ADA compliant pedestrian ramps, new and reset granite curb, new pedestrian signal devices and thermoplastic pavement markings. Project Highlights: 1,200 linear feet of New Granite Curb 2,000…

Read More
Quincy FY20 - Roadway Improvements Project

Quincy FY20 – Roadway Improvements Project

Roadway and sidewalk reconstruction to (18) streets located in Quincy, Massachusetts.  These improvements consisted of new ADA complaint concrete sidewalks, driveways, wheelchair ramps, new and reset granite curb, full depth reclamation and new asphalt road assemblies Project Highlights: 6,730 linear…

Read More
Milton Academy - Centre Street Pedestrian

Milton Academy – Centre Street Pedestrian Improvements

Completed intersection improvements at the intersection of Voses Lane and Centre St to improve pedestrian safety. These improvements consisted of the installation of new rectangular rapid flashing beacons (RRFBs), new granite edge stone, ADA compliant concrete walkways and pedestrian ramps,…

Read More
MassDOT 106136 - Gallivan Blvd and Morton Street Road Improvement including Traffic Signals

MassDOT 106136 – Gallivan Blvd and Morton Street Road Improvement including Traffic Signals

Completed highway reconstruction and intersection improvements on Gallivan Boulevard and Morton St located in Boston, Massachusetts. Installed new Traffic Signal Reconstructions at (5) intersection, including new mast arms and drilled shaft foundations, controllers, pedestrian signals, audible push APS push buttons…

Read More
Brookline PW21-06 Columbia Street Reconstruction

Brookline PW21-06 Columbia Street Reconstruction

Roadway reconstruction and pedestrian improvements on Columbia St and Hamilton Rd in Brookline, Massachusetts. The existing road was stabilized by pulverizing and regrading before the installation of new asphalt binder and top courses.  The scope also included new traffic calming…

Read More
Boston sidewawlks

Boston #51527 – Sidewalk Repairs on Various Streets Including Pedestrian Ramp Upgrades in the City of Boston

Various ADA improvements to walkways and ramps in the Boston Area.  Improvements ranged from resetting granite edge stones, ADA compliant pedestrian ramps and walkways, bituminous concrete surfaces and brick sidewalks. Project Highlights: 30,000 square feet of concrete sidewalks, wheel chair…

Read More

Quincy – Storm Riley Emergency Response #18-211

Emergency infrastructure repair contract in response to the City of Quincy’s declared State of Emergency due to coastal damage from March 2018’s Nor’easter Storm Riley. Focus of work was sidewalk and road repairs impacted by erosion damage and intent was…

Read More

Roxbury Walkable Streets

Sidewalk and pedestrian ramp reconstruction in the following Roxbury locations identified as high priority by the City of Boston: Elm Hill Ave, Wyoming, Harrishof Street, Humboldt Ave, Homestead Street, Walnut Ave and Crawford Street. Scheduled completion June 2019. Project Scope…

Read More

Boston CIP 17-24

Reconstruction of Summer Street in The Seaport Area of South Boston. Scheduled completed August of 2019. Installed new street lighting conduit, pull boxes, ornamental poles/LED luminaires, controllers and electrical service connections. Installed new traffic control conduit, pull boxes, mast arms…

Read More

Newton 15-112 – Roadway & Signal Improvements at Beacon Street & Collins Road

The work included cold plane and overlay of the existing roadway with bituminous concrete, full depth pavement reconstruction, installation of new granite curb, new cement concrete sidewalk, installation of new traffic signals, installation of a new pedestrian activated (HAWK) signal,…

Read More

Milton & DCR T16-1 – Blue Hill Parkway Traffic Improvements & Road Reconstruction

The purpose of this project was to make traffic, roadway, sidewalk, street lighting and streetscape/landscaping improvements along Blue Hills Parkway from Eliot Street to Mattapan Square with signal system related modifications at three intersections north of Mattapan Square and one…

Read More

Department of Conservation and Recreation: East of Route 495

Fred DeRoma & Son, Inc. completed work under this contract that consisted of, but was not limited to, the installation of new pedestrian ramps, rehabilitation of existing pedestrian ramps, installation of new granite curb, removal and resetting of existing granite…

Read More

Boston Convention Center

BOSTON CONVENTION & EXHIBITION CENTER North Ramp Wall Weatherproofing Improvements Fred DeRoma & Son, Inc. provided work on this project that consisted of the excavation of a 4,000 square foot concrete walkway and delaminated/loose existing waterproofing membrane or drainage board.…

Read More

Boston CIP 17-31

Boston CIP 17-31: Reading Street. Reading/Kemble Street (820)LF to the following: “Highway Reconstruction in Bennett Street, Corey Street, Farnham Street, Grantley Street, Hillock Street, Kemble Street, Lovis Street, Proctor Street, Railroad Street, Reading Street, and Sanford Street. Work included (10”)…

Read More

Boston CIP 16-22 Mattapan Square Streetscapes

BOSTON CIP 16-22 Mattapan Square Streetscape Improvements on Blue Hill Avenue Fred DeRoma & Son, Inc. installed a new drip irrigation system, including water main tap, meter pit, backflow preventer, electrical service, and irrigation controls. Construct raised planting beds using…

Read More

Boston Area 2 and Area 3 ADA Reconstruction

Boston Area 2 and 3 ADA Sidewalk and Pedestrian Ramp Reconstruction (Contracts 43698 & 43699) The work provided by Fred DeRoma & Son, Inc. under this contract consisted of, but was not limited to, making repairs to existing brick, cement…

Read More

225 Centre Street

225 CENTRE STREET Sidewalk Improvements Sidewalk Reconstruction on Columbus Ave/Centre Street in Roxbury, MA Work provided by Fred DeRoma & Son, Inc. consisted of the installation of a six-inch underdrain for storm water management, street lighting infrastructure, BTD interconnect replacement…

Read More