~ We make Greater Boston Accessible ~
Scope of Work Description:
Installed a new traffic signal system at the intersection of Bartlett Station Drive and Washington St. Constructed new concrete sidewalks and ramps on Bartlett St, Guild St and Lambert Ave. (7,500) CY fill operation at the Lawn on Lambert area including (1,200 SF) cast-in-place retaining wall, masonry veneer and decorative fencing. Installation of new drainage and electrical infrastructure for future playground.

















