Reconstruction of Summer Street in The Seaport Area of South Boston. Scheduled completed August of 2019.

Installed new street lighting conduit, pull boxes, ornamental poles/LED luminaires, controllers and electrical service connections. Installed new traffic control conduit, pull boxes, mast arms with foundations, signals with foundations, controllers and electrical service connections. Installed new RRFB systems. Reset and installed new edgestone, new drainage structures, ADA compliant sidewalks and pedestrian ramps, hot-mix-asphalt cycle track, and permeable pavers. Installed new structural soil subbase and performed full-depth road reconstruction. Demo and reconstruction bridge barrier wall and railing over A Street. Mill and pave Summer Street and installed bus stop railings, decorative bike racks, benches, bollards, solar powered trash receptacles, signage and pavement markings.

“Project Scope Highlights:”

  • Superpave HMA: (1,820)Tons
  • Reset and installed new curbing: (2,825)LF
  • ADA compliant sidewalks and pedestrian ramps with saw cut joints: (23,500)SF
  • Permeable interlocking pavers: (8,775)SF
  • Structural Soil: (1,520)CY
  • Street lighting & traffic conduit: (4,980)LF
  • Street lighting & traffic pull boxes: (71)EA
  • Street lighting foundations and ornamental lighting: (42)EA
  • Traffic signals: (12)EA
  • Mast Arms with foundations: (2)EA
  • Traffic & street lighting controllers: (2)EA
  • RRFB’s:(6)EA
  • Cast-in-place bridge barrier wall and railing: (114)LF
  • Catch basins: (12)EA
  • (12”) Drainage piping: (325)LF
  • (6”) Gate valves: (6)EA
  • Hydrant relocations: (5)EA