Bartlett Place Infrastructure Improvements – Roxbury, MA

Scope of Work Description: Installed a new traffic signal system at the intersection of Bartlett Station Drive and Washington St.  Constructed new concrete sidewalks and ramps on Bartlett St, Guild St and Lambert Ave.  (7,500) CY fill operation at the…

Boston CIP 22-31

Boston – 2024 Area 2 Pedestrian Improvements

Boston – Fenway Walkable Streets

Cambridge – 2025 Sidewalk Maintenance

Cambridge – 2025 Sidewalk Improvements

MassDOT #109994 – District 6 Sidewalks

Scope of Work Description: Reconstruction of (1,489)SY pedestrian facilities including concrete sidewalks and wheel chair ramps, installation of (2,165)LF granite curbing, thermoplastic crosswalks, signage and guardrails throughout Distict 6 with various location in Boston Proper.

MBTA – A08CN01 – Bus Stop Improvements

Scope of Work Description: Reconstruction of (76) bus stops throughout MA and the installation of (1,274) system-wide bus stop signs.  Reconstructed over (52,085)SF of ADA compliant concrete flatwork, (6,255)LF of granite curbing, (8) LED flashing traffic signs, (6) RRFB Pedestrian…

Needham 23DPW-122C Curb & Sidewalks

Scope of Work Description: 3 year project to improve pedestrian accessibility throughout Needham, MA.  Installed a total of (95,625)SF of concrete flatwork, (1,774)TN of asphalt sidewalks and driveways and (21,119)LF of granite curbing and (8,394)CY of excavations.  Also included miscellaneous…

Quincy – #21-246 Road Improvements

Scope of Work Description: Reconstruction of (15) Streets including (58,772 SY) full-depth reclaim and re-grading of each street, (12,048 TN) new asphalt base and surface pavements, installation of new and existing granite curbing (23,311 LF) and new ADA compliant concrete…

Quincy – Reconstruction of Quincy Ave

Scope of Work Reconstructed (5,400 )LF of Quincy Ave including (48,000) SY of (5″) cold plane with (8,525) TN of new asphalt paving.  (115,232) SF of new concrete sidewalks, driveways and wheelchair ramps, over (10,823)+ LF of granite curb installation. …

Quincy #22-184 Road Improvements

Scope of Work Description: Reconstruction of (14) Streets including full-depth reclaim and re-grading (51,853 SY), new asphalt base and surface pavements (13,183 TN), installation of new and existing granite curbing (23,129 LF) and new ADA compliant concrete sidewalks & wheelchair…

Quincy #23-195 Road Improvements

Scope of Work Description: Reconstruction of (15) Streets including (28,820) SY full-depth reclaim and (10,953) TN new asphalt pavements, (16,462) LF of curbing and (16,961) SY new ADA compliant concrete sidewalks & wheelchair ramps.

Quincy #23-215 Road Improvements

Scope of Work Description: Reconstruction of (9) Streets including (22,488) SY full-depth reclaim and (5,354) TN new asphalt pavements, (11,400) LF of curbing and (11,200)+ SY new ADA compliant concrete sidewalks & wheelchair ramps.

Quincy #24-141 Road Improvements

Scope of Work Description: Reconstruction of (12) Streets including (38,972 SY) of full-depth reclaim, (9,497) TN new asphalt pavements, (23,176) LF curb installation, (61,196)SY fine grading,  and (23,760) SY ADA compliant concrete flatwork.

MassDOT 106432: Sidewalk, Wheelchair Ramp, and Crosswalk Repairs and Improvements at Various CA/T Locations

Description: Completed sidewalk reconstruction for MassDOT in coordination with the Boston Public Works and Boston Transportation Department.  The work included in various ADA upgrades and full depth roadway reconstruction at key pedestrian crossing points within Boston Proper. Project Highlights: 59,085…

Westwood Pedestrian Safety Enhancements Project

Pedestrian safety enhancements in the Town of Westwood through the installation of new ADA compliant pedestrian ramps, new and reset granite curb, new pedestrian signal devices and thermoplastic pavement markings. Project Highlights: 1,200 linear feet of New Granite Curb 2,000…

Quincy FY20 – Roadway Improvements Project

Roadway and sidewalk reconstruction to (18) streets located in Quincy, Massachusetts.  These improvements consisted of new ADA complaint concrete sidewalks, driveways, wheelchair ramps, new and reset granite curb, full depth reclamation and new asphalt road assemblies Project Highlights: 6,730 linear…

Milton Academy – Centre Street Pedestrian Improvements

Completed intersection improvements at the intersection of Voses Lane and Centre St to improve pedestrian safety. These improvements consisted of the installation of new rectangular rapid flashing beacons (RRFBs), new granite edge stone, ADA compliant concrete walkways and pedestrian ramps,…

MassDOT 106136 – Gallivan Blvd and Morton Street Road Improvement including Traffic Signals

Completed highway reconstruction and intersection improvements on Gallivan Boulevard and Morton St located in Boston, Massachusetts. Installed new Traffic Signal Reconstructions at (5) intersection, including new mast arms and drilled shaft foundations, controllers, pedestrian signals, audible push APS push buttons…

Brookline PW21-06 Columbia Street Reconstruction

Roadway reconstruction and pedestrian improvements on Columbia St and Hamilton Rd in Brookline, Massachusetts. The existing road was stabilized by pulverizing and regrading before the installation of new asphalt binder and top courses.  The scope also included new traffic calming…

Boston #51527 – Sidewalk Repairs on Various Streets Including Pedestrian Ramp Upgrades in the City of Boston

Various ADA improvements to walkways and ramps in the Boston Area.  Improvements ranged from resetting granite edge stones, ADA compliant pedestrian ramps and walkways, bituminous concrete surfaces and brick sidewalks. Project Highlights: 30,000 square feet of concrete sidewalks, wheel chair…

Quincy – Storm Riley Emergency Response #18-211

Emergency infrastructure repair contract in response to the City of Quincy’s declared State of Emergency due to coastal damage from March 2018’s Nor’easter Storm Riley. Focus of work was sidewalk and road repairs impacted by erosion damage and intent was…

Roxbury Walkable Streets

Sidewalk and pedestrian ramp reconstruction in the following Roxbury locations identified as high priority by the City of Boston: Elm Hill Ave, Wyoming, Harrishof Street, Humboldt Ave, Homestead Street, Walnut Ave and Crawford Street. Scheduled completion June 2019. Project Scope…

Boston CIP 17-24

Reconstruction of Summer Street in The Seaport Area of South Boston. Scheduled completed August of 2019. Installed new street lighting conduit, pull boxes, ornamental poles/LED luminaires, controllers and electrical service connections. Installed new traffic control conduit, pull boxes, mast arms…

Newton 15-112 – Roadway & Signal Improvements at Beacon Street & Collins Road

The work included cold plane and overlay of the existing roadway with bituminous concrete, full depth pavement reconstruction, installation of new granite curb, new cement concrete sidewalk, installation of new traffic signals, installation of a new pedestrian activated (HAWK) signal,…

Milton & DCR T16-1 – Blue Hill Parkway Traffic Improvements & Road Reconstruction

The purpose of this project was to make traffic, roadway, sidewalk, street lighting and streetscape/landscaping improvements along Blue Hills Parkway from Eliot Street to Mattapan Square with signal system related modifications at three intersections north of Mattapan Square and one…

Department of Conservation and Recreation: East of Route 495

Fred DeRoma & Son, Inc. completed work under this contract that consisted of, but was not limited to, the installation of new pedestrian ramps, rehabilitation of existing pedestrian ramps, installation of new granite curb, removal and resetting of existing granite…

Boston Convention Center

BOSTON CONVENTION & EXHIBITION CENTER North Ramp Wall Weatherproofing Improvements Fred DeRoma & Son, Inc. provided work on this project that consisted of the excavation of a 4,000 square foot concrete walkway and delaminated/loose existing waterproofing membrane or drainage board.…

Boston CIP 17-31

Boston CIP 17-31: Reading Street. Reading/Kemble Street (820)LF to the following: “Highway Reconstruction in Bennett Street, Corey Street, Farnham Street, Grantley Street, Hillock Street, Kemble Street, Lovis Street, Proctor Street, Railroad Street, Reading Street, and Sanford Street. Work included (10”)…

Boston CIP 16-22 Mattapan Square Streetscapes

BOSTON CIP 16-22 Mattapan Square Streetscape Improvements on Blue Hill Avenue Fred DeRoma & Son, Inc. installed a new drip irrigation system, including water main tap, meter pit, backflow preventer, electrical service, and irrigation controls. Construct raised planting beds using…

Boston Area 2 and Area 3 ADA Reconstruction

Boston Area 2 and 3 ADA Sidewalk and Pedestrian Ramp Reconstruction (Contracts 43698 & 43699) The work provided by Fred DeRoma & Son, Inc. under this contract consisted of, but was not limited to, making repairs to existing brick, cement…

225 Centre Street

225 CENTRE STREET Sidewalk Improvements Sidewalk Reconstruction on Columbus Ave/Centre Street in Roxbury, MA Work provided by Fred DeRoma & Son, Inc. consisted of the installation of a six-inch underdrain for storm water management, street lighting infrastructure, BTD interconnect replacement…